A risk assessment/risk analysis is a legal requirement for the CE marking of machinery and plants (usually derived from the Machinery Regulation (EU) 2024/1230). It must be carried out before the product is placed on the market and cover the hazards of the entire life cycle. The aim is to systematically reduce risks throughout the entire life cycle of a machine or plant. The risk assessment is an integral part of the so-called conformity assessment procedure.
In plant engineering, the conformity assessment follows this simplified formula:
CE conformity from a single source: from the risk assessment to the declaration of conformity. docemos GmbH supports you in carrying out, moderating and fully documenting this process in line with the standards – without taking over the planning responsibility.
For a machine or an assembly of machines within the meaning of the Machinery Regulation (EU) 2024/1230, this means:
- Moderation of the risk assessment in accordance with DIN EN ISO 12100: warnings, safety instructions and operating information are derived from the risk assessment and incorporated into the operating instructions.
- Preparation of the operating instructions in accordance with DIN EN IEC 82079-1
- Compilation of the plant documentation in accordance with Annex III, Section 1.7.4.2 of the Machinery Regulation